The construction area of the project is 130992.2 square meters. The project is located in Xintang street, Xiaoshan District, close to the niangqiao station of Metro Line 5 (Hangzhou Shaoxing light rail transfer station) and the bridgehead in the east of Hangzhou. The north side of the plot is Caihong Avenue, the east side is Shanghai Kunming expressway, the south side is Xiaoshao canal, and the west side is 03 provincial road.